Proposed Redevelopment of Choa Chu Kang Cemetery (Phase 3A)
National Environment Agency (NEA)
Choa Chu Kang (N-1-17A, N-1-17B (1), N-1-19A and N-1-19B)
June 2019
Construction and installation of precast crypts with sub-soil drainage system; Construction of Earthworks, Drainage works, detention tank system, road, footpath, concrete platform, ramp, pavilion including the supply, installation, testing and commissioning of the lightning protection system, Landscaping works including turfing, trees planting, etc.