Chye Joo Construction

Sentosa – Sentosa Causeway Bridge

Back To Top Project Details Client: Sentosa Development Corporation (SDC) Location: Sentosa Causeway Bridge, Gateway Ave Project Completion: Jul 1999 Proposed Diversion of Services, Construction of New Services Platform & Conversion of Walkway to Roadway at Sentosa Causeway Bridge, Gateway Ave Scope of works: Installation of 7 Nos of Steel Structural Cable Tray and Installation […]

More – NUS Infra Work Project

Back To Top Project Details Client: National University Singapore (NUS) Location: The University Town, NUS Project Completion: December 2009 Proposed Infrastructure (Civil, Structural, Mechanical and Electrical) at the University Town, NUS Scope of works: Drain works, Road, Works, Services Trenches, M&E Services like Laying & Commissioning of Gas, Water, Newater Pipes & Sewer Lines, Laying […]

JTC – Tuas View Extension Phase 2B

Back To Top Project Details Client: Jurong Town Corporation (JTC) Location: Tuas View Extn Phase 2B Project Completion: October 2009 Proposed Construction of Roads, Drains & Sewer at Tuas View Extn Phase 2B Scope of works: Construction of roads (10.80m wide dual carriageway of 820m length), RC box drain (1.50m – 4.00m wide), sewers (300mm […]

LTA – H1007

Back To Top Project Details Client: Land Transport Authority (LTA) Project Completion: October 2018 Contract H1007-Demolition, Pile Extraction and Advance Earthworks Scope of works: Site clearance, Earthworks, Pile extraction & removal, ECM, Design Supply & Construct Site hoarding and Tree felling.

Sentul Crescent Extension and Bridge over Punggol Waterway

Back To Top Project Details Client: Housing and Development Board (HDB) Location: Project 1: Punggol Waterway  Project 2: Punggol Promenade  Project 1: Construction of Sentul Crescent Extension and Bridge over Punggol Waterway Project 2: Additions and Alterations to Seawall at Punggol Promenade Scope of works: Bridge Over Punggol Waterway including road base, wearing course, road […]

Others – Cemetery Works – Proposed Redevelopment of Choa Chu Kang Cemetery (Phase 3B)

Back To Top Project Details Client: National Environment Agency (NEA) Location: Choa Chu Kang Project Completion: September 2019 Proposed Development of Choa Chu Kang Cemetery (Phase 3B) Scope of works: Construction and installation of precast crypts with sub-soil drainage system; Construction of Earthworks, Drainage works, detention tank system, road, footpath, concrete platform, ramp, pavilion including […]

Others – Cemetery Works – Proposed Redevelopment of Choa Chu Kang Cemetery (3A)

Back To Top Project Details Client: National Environment Agency (NEA) Location: Choa Chu Kang (N-1-17A, N-1-17B (1), N-1-19A and N-1-19B) Project Completion: June 2019 Proposed Development of Choa Chu Kang Cemetery (Phase 3A) Scope of works: Construction and installation of precast crypts with sub-soil drainage system; Construction of Earthworks, Drainage works, detention tank system, road, […]

Others – Cemetery Work – Proposed Development of Choa Chu Kang Cemetery

Back To Top Project Details Client: National Environment Agency (NEA) Location: Choa Chu Kang Project Completion: January 2016 Proposed Development of Choa Chu Kang Cemetery Scope of works: Construction of Precast Crypts with subsoil drain. RC Shelters, Driveways, footpaths, drains, landscaping works and reinstatement works